• Before Gallery

  • After Gallery

About the Project

We were hired to do a remodel of this home, giving it an updated appearance. Our team completed a rehab of the master bathroom and guest bathroom. In the living room, we installed a new fireplace insert and our wood shop custom made the built-in shelving and custom fireplace mantel. The kitchen received a face lift with repainted kitchen cabinets and crown molding, a new range hood,new countertops and a tile backsplash. The home received a new front door and new interior doors throughout. The dining room is incredible now with a custom-made (by our wood shop) wooden decor piece inserted into the tray ceiling. And finally, the stairway to the upstairs has new railings and newel posts.

  • Year Built: 2018
  • Duration of Project: 6 months

  • Location: Saratoga Springs, NY
BACK TO PORTFOLIO

“In all of my dealings with Bonacio Construction, integrity, honesty, quality, commitment to the client and service orientation have been common traits demonstrated by each and every Bonacio associate.”

- Joel S.